How we take a pilot to production in three to four weeks.

The same four-step shape whether we are shipping an AI system or a custom PCB, in a cycle of three to four weeks.

01How we work

The four steps

Week one freezes scope to one vertical slice and sets architecture. Week two builds the pilot on real data, with daily progress and weekly demos. Week three covers compliance, CI/CD and monitoring, or hardware design rule checks and fab-ready outputs. Week four delivers a production deploy or V1 manufacturing package, full source handover and a close-out note.

  1. Step 1, week 1: scope and architecture

    A single 30-minute call defines the pilot. We freeze scope to one vertical slice, choose the architecture and lock the production environment. An explicit out-of-scope list goes in the project channel.

  2. Step 2, week 2: build the pilot

    Senior engineers build the working pilot against your real data, with daily progress and a weekly demo. For AI work, evaluation gates exist before prompt tuning begins.

  3. Step 3, week 3: harden for production

    Compliance, CI/CD, monitoring and, where it applies, GDPR data residency. For hardware: design rule checks, the bill of materials and fab-ready outputs.

  4. Step 4, week 4: ship and hand over

    Production deploy or a V1 manufacturing package, full source handover and a written close-out note.

02How we work

Software and hardware at each step

Software and hardware work follow four shared steps with different outputs. For software and AI, they run from a scoped user journey and working slice to hardening with authentication, logging and a runbook, then repository handover. For hardware, they move from a block diagram to KiCad schematic and layout, then sourcing and manufacturing files, ending with editable source.

What the same step means in each practice
StepSoftware and AIHardware
1. ScopeOne user journey, auth model, stack, staging environmentBlock diagram, power budget, fab target
2. BuildWorking slice on real data, with evaluation setSchematic and layout in KiCad, ERC and DRC
3. HardenAuth, rate limits, logging, compliance, runbookBOM, sourcing, Gerbers, drill and pick and place
4. Hand overRepos, infra notes, eval scripts, walkthroughEditable KiCad source, symbols, footprints, handover note
03How we work

What we need from you

Before the first call, gather a clear brief: your goal and a testable success metric, access to the data or a safe anonymised copy, compliance constraints such as region, regulations and sign-off, who owns the result and the handover you expect, and a realistic timeline.

A clear brief helps a pilot start well. The pilot readiness checklist lists what to gather before the first call.

  • The goal and a success metric you can test
  • Access to the data, or to a safe anonymised copy
  • Compliance constraints: region, regulations, who signs off
  • Who owns the result, and the handover you expect
  • A realistic timeline
04How we work

What full source handover includes

Source on handover is the default on every engagement. Software and AI work includes application code, infrastructure notes, evaluation scripts and a walkthrough. Hardware includes schematics, bill of materials, manufacturing files and editable KiCad source with symbols and footprints. The cycle also ends with a written close-out note.

Source on handover is the default on every engagement, so you own what was built.

  • Software and AI: the application code, infrastructure notes, evaluation scripts and a short walkthrough
  • Hardware: schematics, the bill of materials, Gerbers, drill and pick and place files, and the editable KiCad source with its symbols and footprints
  • A written close-out note
05How we work

What can stretch the timeline

Fine-tuning, multi-tenant isolation at scale and novel hardware bring-up can need a second cycle, and the estimate says so up front. Slow VPC access or pending data protection officer sign-off can stretch calendar time even when engineering is ready. Frozen scope, early evaluations and week-one compliance scoping support the three-to-four-week timeline.

Three to four weeks is repeatable when scope is frozen, evaluations exist early and compliance is scoped in week one. It is not enough for everything. Fine-tuning, multi-tenant isolation at scale and novel hardware bring-up can need a second cycle, and slow access to a VPC or a pending data protection officer sign-off stretches calendar time even when engineering is ready. The estimate says so up front.

06Common questions

Questions we get asked.

Straight answers about methodology.

How long does it take to build an AI MVP?

A scoped pilot takes three to four weeks: scope in week one, build in week two, harden in week three, and ship and hand over in week four. Work that needs fine-tuning, multi-tenant isolation at scale or new hardware bring-up can need a second cycle.

What happens at the end of the four weeks?

You receive a production deploy or a V1 manufacturing package, the full source code or editable design files, and a written close-out note.

How do we stay informed during the build?

Daily progress and a weekly demo, with a written update and a recording or staging link, so a team in a different timezone can follow along.

Does the process change for hardware?

The shape is the same. The outputs differ: design rule checks, a BOM and fab-ready files instead of a deploy.

Ready to scope a pilot?

Send a one-paragraph brief and we will come back with a recommended approach within one business day.