What do field conditions ask of a sensor device?
Outdoor sensing adds demands that a bench prototype may never face. Moisture, dirt, temperature swings, sunlight, corrosion, limited power and patchy coverage can each damage a device or its data. A team should turn every relevant condition into a written requirement and a test before it fixes the board and enclosure.
| Condition | Design question | One way to check |
|---|---|---|
| Water, dust and mud | What protection do the enclosure, cable entries and connectors need? | Test the assembled unit as well as the bare board |
| Heat, cold and sunlight | Do parts, battery and plastics suit the expected range? | Measure behaviour across the temperatures the site can reach |
| Soil contact and corrosion | Which probe materials and coatings last, and how do readings change? | Compare readings from aged and new probes |
| Limited power | What do sleeping, sensing and transmitting each consume? | Measure current on real hardware and compare it with the budget |
| Weak or missing coverage | How much data must the device hold, and what happens on reconnection? | Cut the link on purpose and look for gaps and duplicates |
| Infrequent site visits | How is a failed or drifting unit noticed and serviced? | Rehearse replacement and recalibration with a field user |
These are general engineering questions for agricultural and environmental deployments. The right answers depend on the site, the measurement and how long a unit must run without attention.
How did TerraSenti move from prototype to V1 board?
TerraSenti began as a soil sensor prototype on off-the-shelf parts. PAI Technologies turned it into a V1 custom PCB package for MythraCore Ltd, ready for prototype manufacturing and reference-customer evaluation. The work covered schematic and layout in KiCad, a bill of materials, manufacturing files and documentation, and every source file was handed over.
The brief made the gap plain. Off-the-shelf parts can show that a sensor works, but that prototype cannot be costed, reproduced or sold. The V1 needed its own board, a bill of materials and a package that a fab house could build from.
| Deliverable | Contents |
|---|---|
| Schematic and PCB layout | A reviewed design package built in KiCad |
| BOM and sourcing | Component selection with JLCPCB-aligned sourcing |
| Manufacturing package | Gerbers, drill files, pick and place outputs and JLCPCB settings |
| Handover documentation | A hardware handover note and architecture documentation |
Theo Konstantinou, founder of MythraCore Ltd, is quoted in the case study: “Schematics, BOM, Gerbers and full KiCad source were all in our hands at handover. No black boxes.”
The published case study stops at the V1 package. It reports no field trial results, battery life, measurement accuracy or certification, so this page claims none of them.
Which hardware services apply to a field device?
PAI Technologies lists eight hardware services, from board design and component engineering to firmware support and later revisions. A particular field device may need only some of them. The table below summarises each listed scope and marks which parts the published TerraSenti case study describes, so that service coverage is not mistaken for project evidence.
| Service | Listed scope | Described for TerraSenti |
|---|---|---|
| Custom PCB design | KiCad schematic capture, layout and routing, DRC and ERC, design reviews | Yes: reviewed schematic and layout |
| BOM and component engineering | BOM generation, component selection, JLCPCB sourcing, cost optimisation, supply risk analysis | Yes: bill of materials, selection and aligned sourcing |
| Manufacturing package | Gerber, drill and pick and place outputs in fab-ready packages | Yes |
| Sensor and IoT hardware | Soil sensors, wearables, environmental sensing, low-power hardware suited to field deployment | Yes: custom soil sensor design |
| Prototype to V1 conversion | Off-the-shelf to custom boards, form factor design, bring-up support, design hand-off to manufacturing | Yes: V1 package; bring-up support is not described |
| Hardware documentation | Handover and architecture notes, editable KiCad symbols and footprints | Yes |
| Embedded firmware support | Firmware scoping, MCU integration, hardware and software bridge work with in-house firmware teams | Not described |
| Iterative hardware revision | V1 findings review, fix planning, board split architecture, updated design packages | Not described |
How can a team reduce risk before manufacturing?
Prove the measurement before polishing the product. A team can test the sensing method on off-the-shelf parts, write down the conditions the device must survive, estimate its power use and then commit to a custom board. A small batch placed where the device will operate can reveal faults that bench work misses.
Define the measurement
State what is measured, how often, how accurate it must be and which decision depends on the reading.
Compare with a reference
Check prototype readings against a trusted reference method in the soils or environments that matter.
Budget the power
Estimate consumption in each operating state, then set a target for battery life or a plan for solar or other charging.
Fix the physical limits
Agree size, mounting, probe placement, antenna position and cable routes before the board outline is final.
Plan the data path
Decide how readings leave the device, how they are timestamped, where they are stored and who may use them.
Trial a small batch
Install a few units, record faults and drift, and feed those findings into the next revision.
Why should you hold the hardware design files?
Field findings can force design changes, and a change is much harder if you hold only exported manufacturing files. In the TerraSenti engagement, everything delivered is editable and belongs to the client. The handover included editable KiCad files, symbols and footprints, together with a hardware handover note and architecture documentation for later engineers.
Whoever designs your board, ask for the items below and open the files before you accept the handover.
- Editable schematic and layout sources
- Any custom symbols and footprints the design uses
- A bill of materials with exact manufacturer part numbers
- Fabrication, drill and pick-and-place outputs tied to a revision label
- Written notes on known limits and open questions
What should you send before asking for an estimate?
Describe what you have today: the current prototype, what it measures, where it will be installed, how it is powered, how it sends data and what has already failed. Add size limits, expected quantity and certification needs. PAI Technologies says it will come back with a recommended approach within one business day.
- Photos and a block diagram of the current prototype
- Sensors used, sampling frequency and which readings you trust
- Installation site, exposure and how long units should stay in service
- Power source, radio choice and coverage at the site
- Any existing schematic or parts list, and who owns the firmware